Rib › Racked fabrics
Transfer design of pulled stitches
Long stitches of the first colour pulled sideways across a second-colour ground, in staggered marks. A few front needles knit a stitch in the first colour. The rear bed then knits 6 rows in the second colour, so those front stitches wait and stretch.
- Two beds
Machine types that can knit it
Demo swatch
Drawn for: Double-bed hand flat (V-bed)Approximate preview worked out from the bed chart, not a photo.
Carriage settings on a Dubied
Transfer design of pulled stitches in two coloursHandle all the way down to the right.
- 1. Pick up the first colour. Knit 2 rows.
- 2. Pick up the second colour. Knit 6 rows. Transfer the front stitches on to the rear as the notes' arrows show, and rack 4 needles left by raising the handle. Repeat from the first setting, alternating the rack and the colours.
How to read the cross
- The four quarters are the carriage: top rear bed, bottom front bed, left moving left, right moving right.
- Corners, knit/miss cam: 1 knits; ½ knits on high butts only and misses low butts; 0 is out of work.
- Diamond, tucking cam: 0 no tuck; ½ low butts tuck, high butts knit; 1 all needles tuck. An empty diamond is all 0.
- Numbers on the line are tension dials, 0 tightest to 20 loosest. A + means looser than your usual size.
- Set-out: long tick high butt, short tick low butt, dot out of action.
Steps
- Handle down.
- Set the needles.
- First colour, 2 rows.
- Second colour, 6 rows on the rear bed.
- Transfer the front stitches to the rear.
- Rack 4 needles left.
- Repeat, alternating the rack and the colours.
The full card
- What it looks like
- Long stitches of the first colour pulled sideways across a second-colour ground, in staggered marks.
- How it behaves
- Slight relief where the pulled stitches lie.
- How it works
- A few front needles knit a stitch in the first colour. The rear bed then knits 6 rows in the second colour, so those front stitches wait and stretch. They are transferred on to the rear bed and the bed is racked 4 needles, so the next stitches land in a new place.
- Machines
- Dubied. Handle starts all the way down.
- Parameters
- 2 rows and 6 rows. Rack 4 needles. Front tension looser than rear.
- Steps
- 1) Handle down. 2) Set the needles. 3) First colour, 2 rows. 4) Second colour, 6 rows on the rear bed. 5) Transfer the front stitches to the rear. 6) Rack 4 needles left. 7) Repeat, alternating the rack and the colours.
- Charting
- Bed chart with transfers marked and rack positions.
- Limits and common problems
- Front tension too tight and the waiting stitches snap.
- Combines with
- dropped-stitch-design, dubied-racking.
- Pieces and assembly
- Accent panels.
Written in our own words from machine manuals, knitting references and swatching. Knit a test swatch before a whole piece.